Product Details
+
- MaterialMade with a high-quality blend of cotton and premium fibers, our women's plaid pants offer an ideal balance of comfort, durability, and breathability.
- Design These women's checkered pants feature a classic gingham print, a stretchy elastic waistband, wide legs, ankle-length inseam, and functional side pockets. These gingham pants blend style and practicality.
- MatchingPair plaid trousers with T-shirts, vests, blouses, sweatshirts, or jackets. Complete your look with flats, sandals, sneakers, boots, or heels for a chic ensemble. Perfect for spring and summer, these pants are a versatile addition to your wardrobe.
- OccasionOur plaid long pants are perfect for any occasion, from casual daily wear to special events. Suitable for home, street, office, school, beach, parties, clubs, shopping, dating, and holidays, these pants blend comfort and style seamlessly.
- Garment CareThis relaxed-fit boxer pants for women are easy to care formachine or hand washable. Please refer to the size chart carefully to find your best fit, as the pants are designed to be loose and comfortable. Note: Size may vary by up to 1 inch due to manual measurement.